Sadly, with this phase of renovation, there was no drywall demolition. I say sadly because drywall demolition is one of my favorite activities. Deconstruction is now finished. The plumber came in first and removed the toilet and disconnected the sink. I removed the wallpaper, tile floors, the vanity, and all the fixtures. I then had a contractor come in and remove the second layer of plywood subfloor which only went around the old vanity. As with previous rooms I have renovated, at some point, “renovators” came and removed the old floor, but only around the old vanity, then put in another layer of plywood subfloor for no discernible reason, and then tiled. Thus everything had to come out to get to the original subfloor.